Skip links

Maya Train Section 5 South
B: Akumal – Paamul

20.7 km
LENGTH
México
LOCATION
$ 2,700 MDP
BUDGET
Track assembly.
Fonatur/GAMI
Client
Track assembly
Contract type
2023-2024
Construction period
Azvi

Description of works

41 .4 km of track and catenary assembly.

This section is double track on ballast, electrified far mixed traffic, with the specifications of 17 tonnes per axle and 160 km/h far passengers and 32 tonnes per axle and 100 km/h far freight.

Azvi

Proyectos relacionados

Explorar
Mover