Tapachula–Talismán Highway

Tapachula–Talismán Highway 45.1 km LENGTH $ 957 MDP INVESTMENT The Tapachula–Talismán Highway, with a branch to Ciudad Hidalgo, is a 45.1 km highway with an investment of 57 million euros that connects Tapachula with the Guatemalan border, promoting trade, tourism, and economic integration between Mexico

Don-Nogales Highway

Don-Nogales Highway 61.6 km LENGTH $ 785 MDP INVESTMENT Estado de Sonora, México LOCATION Modernization and expansion of the Estación Don-Nogales highway, Ciudad Obregón-Guaymas section from km 0+000 to km 10+500 and from km 26+000 to km 77+100 right carriageway “A”. Urales Description of the

Jala–Puerto Vallarta Highway

Jala–Puerto Vallarta Highway 21.8 km LENGTH $ 2,100 MDP INVESTMENT Construction and paving, structures, tunnels, drainage works and ancillary works, and signage. Urales Description of the works Construction and modernization of three subsections of the Jala–Compostela section. This project was part of the construction of

Interlomas-Huixquilucan Connection Bridge

Interlomas-Huixquilucan Connection Bridge 6,5 M € INVESTMENT State of Mexico LOCATION Urales Descripction works Additional works in the construction of a 227 m long ribbed balanced cantilever bridge, consisting of the placement of hydraulic concrete in the substructure, asphalt pavement, access roads, horizontal and vertical

Hornos IV Viaduct

Hornos IV Viaduct 204 m LENGTH State of Michoacán, Mexico LOCATION The lump-sum construction contract includes the construction, expansion and modernization of more than 360 km of strategic highways in the state of Michoacán. Among them are the Morelia Bypass (64.1 km), the Uruapan Bypass

El Nispo Viaduct

El Nispo Viaduct 320 m LENGTH State of Michoacán, Mexico LOCATION Urales Description The Morelia Bypass consists of the construction of a new A2-type highway infrastructure with a length of 63.1 km, starting at km 0+500.00 of the Mexico–Guadalajara highway and ending at km 58+136.83

Santa Marta Terminal Station

Santa Marta Terminal Station México COUNTRY $ 600 MDP INVESTMENT The construction of the Estación Terminal Santa Marta of the Elevated Trolleybus has been carried out, a strategic project to improve connectivity and public transportation in the eastern area of Ciudad de México. The works

Palo Alto Wind Farm

Palo Alto Wind Farm 116 VIVIENDAS Mexico COUNTRY $ 610 MDP INVESTMENT Azvi was responsible for the civil works for the installation of the wind turbines: foundations and assembly platforms; access and circulation roads; and drainage works and trenches for the installation of the network