Palo Alto Wind Farm

116
VIVIENDAS
Mexico
COUNTRY
$ 610 MDP
INVESTMENT

Azvi was responsible for the civil works for the installation of the wind turbines: foundations and assembly platforms; access and circulation roads; and drainage works and trenches for the installation of the network cabling.

Jalisco
Location
43
Wind turbines
2
Meteorological towers
27.2 km
Access and connection roads
Enel Green Power
Client
Azvi

Description of the works

Provision of civil works services, including the construction of:

  • Main road and access roads.
  • Platforms for the assembly of wind turbines.
  • Trenches.
  • Wind turbine foundations.
  • Installation of fiber optics, medium voltage and grounding system.